{"version":"1.0","provider_name":"PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca","provider_url":"https:\/\/www.pesca.pet\/en\/","author_name":"Marko Herrmann","author_url":"https:\/\/www.pesca.pet\/en\/author\/marko\/","title":"Creation of the Tucuru\u00ed dam, Par\u00e1 &#8211; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"yHLJ35xL02\"><a href=\"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/\">Creation of the Tucuru\u00ed dam, Par\u00e1<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/embed\/#?secret=yHLJ35xL02\" width=\"600\" height=\"338\" title=\"&#8220;Creation of the Tucuru\u00ed dam, Par\u00e1&#8221; &#8212; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca\" data-secret=\"yHLJ35xL02\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script>\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/www.pesca.pet\/wp-includes\/js\/wp-embed.min.js\n<\/script>\n","thumbnail_url":"https:\/\/i0.wp.com\/pesca.pet\/wp-content\/uploads\/2020\/05\/Tucuru\u00ed.jpg?fit=960%2C580&ssl=1","thumbnail_width":960,"thumbnail_height":580,"description":"The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government's policy for the development of the North region, starting in the 1960s in search of the region's economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers - (Vila Permanente and Temporary Villages I and II). Eletronorte's villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW."}