{"id":22648,"date":"1984-11-22T16:10:51","date_gmt":"1984-11-22T19:10:51","guid":{"rendered":"https:\/\/www.pesca.pet\/criacao-da-represa-de-tucurui-para\/"},"modified":"2020-06-09T22:41:35","modified_gmt":"2020-06-10T01:41:35","slug":"criacao-da-represa-de-tucurui-para","status":"publish","type":"post","link":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/","title":{"rendered":"Creation of the Tucuru\u00ed dam, Par\u00e1"},"content":{"rendered":"<p>The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government&#8217;s policy for the development of the North region, starting in the 1960s in search of the region&#8217;s economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.<\/p>\n<p>Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers &#8211; (Vila Permanente and Temporary Villages I and II). Eletronorte&#8217;s villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government&#8217;s policy for the development of the North region, starting in the 1960s in search of the region&#8217;s economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21910,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[691,679],"tags":[235,682,683,421],"class_list":["post-22648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-estructura-y-organizacion","category-fishing-in-brazil","tag-fishing-engineering","tag-linha-do-tempo-en","tag-pesca-no-brasil-en","tag-pet-fishery"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Creation of the Tucuru\u00ed dam, Par\u00e1 &#8211; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca<\/title>\n<meta name=\"description\" content=\"The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government&#039;s policy for the development of the North region, starting in the 1960s in search of the region&#039;s economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers - (Vila Permanente and Temporary Villages I and II). Eletronorte&#039;s villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Creation of the Tucuru\u00ed dam, Par\u00e1 &#8211; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca\" \/>\n<meta property=\"og:description\" content=\"The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government&#039;s policy for the development of the North region, starting in the 1960s in search of the region&#039;s economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers - (Vila Permanente and Temporary Villages I and II). Eletronorte&#039;s villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/\" \/>\n<meta property=\"og:site_name\" content=\"PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PETPescaUFRA\/\" \/>\n<meta property=\"article:published_time\" content=\"1984-11-22T19:10:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-06-10T01:41:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/pesca.pet\/wp-content\/uploads\/2020\/05\/Tucuru\u00ed.jpg?fit=960%2C580&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"580\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marko Herrmann\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@pesca_pet\" \/>\n<meta name=\"twitter:site\" content=\"@pesca_pet\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marko Herrmann\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/\"},\"author\":{\"name\":\"Marko Herrmann\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#\\\/schema\\\/person\\\/a6c69adcd955e2976312c7db3979549a\"},\"headline\":\"Creation of the Tucuru\u00ed dam, Par\u00e1\",\"datePublished\":\"1984-11-22T19:10:51+00:00\",\"dateModified\":\"2020-06-10T01:41:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/\"},\"wordCount\":194,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pesca.pet\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Tucuru\u00ed.jpg\",\"keywords\":[\"Fishing Engineering\",\"Linha do Tempo\",\"Pesca no Brasil\",\"PET Fishery\"],\"articleSection\":[\"Estructura y organizaci\u00f3n\",\"Fishing in Brazil\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/\",\"url\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/\",\"name\":\"Creation of the Tucuru\u00ed dam, Par\u00e1 &#8211; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pesca.pet\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Tucuru\u00ed.jpg\",\"datePublished\":\"1984-11-22T19:10:51+00:00\",\"dateModified\":\"2020-06-10T01:41:35+00:00\",\"description\":\"The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government's policy for the development of the North region, starting in the 1960s in search of the region's economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers - (Vila Permanente and Temporary Villages I and II). Eletronorte's villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pesca.pet\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Tucuru\u00ed.jpg\",\"contentUrl\":\"https:\\\/\\\/www.pesca.pet\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/Tucuru\u00ed.jpg\",\"width\":960,\"height\":580},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/criacao-da-represa-de-tucurui-para\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Creation of the Tucuru\u00ed dam, Par\u00e1\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/\",\"name\":\"PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#organization\",\"name\":\"PET Fishery - Fishery Engineering Tutorial Education Program\",\"url\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pesca.pet\\\/wp-content\\\/uploads\\\/2017\\\/05\\\/Logo72dpi300x300.png\",\"contentUrl\":\"https:\\\/\\\/www.pesca.pet\\\/wp-content\\\/uploads\\\/2017\\\/05\\\/Logo72dpi300x300.png\",\"width\":300,\"height\":300,\"caption\":\"PET Fishery - Fishery Engineering Tutorial Education Program\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PETPescaUFRA\\\/\",\"https:\\\/\\\/x.com\\\/pesca_pet\",\"https:\\\/\\\/www.instagram.com\\\/pesca.pet\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCGt6tGSMpezD9g2rlEvkR_w\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/#\\\/schema\\\/person\\\/a6c69adcd955e2976312c7db3979549a\",\"name\":\"Marko Herrmann\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ce51fccf8c3e0c722d66f3f16b430346d5b7aecfb635219c6af1b13a77dcde9c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ce51fccf8c3e0c722d66f3f16b430346d5b7aecfb635219c6af1b13a77dcde9c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ce51fccf8c3e0c722d66f3f16b430346d5b7aecfb635219c6af1b13a77dcde9c?s=96&d=mm&r=g\",\"caption\":\"Marko Herrmann\"},\"description\":\"Doctor in marine biology, university professor, tutor of the Fishery Engineering Tutorial Education Program - PET Pesca, actually researching and teaching at graduate and undergraduate courses at the Federal Rural University of Amazonia.\",\"sameAs\":[\"https:\\\/\\\/www.pesca.pet\"],\"url\":\"https:\\\/\\\/www.pesca.pet\\\/en\\\/author\\\/marko\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Creation of the Tucuru\u00ed dam, Par\u00e1 &#8211; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca","description":"The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government's policy for the development of the North region, starting in the 1960s in search of the region's economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers - (Vila Permanente and Temporary Villages I and II). Eletronorte's villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/","og_locale":"en_US","og_type":"article","og_title":"Creation of the Tucuru\u00ed dam, Par\u00e1 &#8211; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca","og_description":"The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government's policy for the development of the North region, starting in the 1960s in search of the region's economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers - (Vila Permanente and Temporary Villages I and II). Eletronorte's villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW.","og_url":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/","og_site_name":"PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca","article_publisher":"https:\/\/www.facebook.com\/PETPescaUFRA\/","article_published_time":"1984-11-22T19:10:51+00:00","article_modified_time":"2020-06-10T01:41:35+00:00","og_image":[{"width":960,"height":580,"url":"https:\/\/i0.wp.com\/pesca.pet\/wp-content\/uploads\/2020\/05\/Tucuru\u00ed.jpg?fit=960%2C580&ssl=1","type":"image\/jpeg"}],"author":"Marko Herrmann","twitter_card":"summary_large_image","twitter_creator":"@pesca_pet","twitter_site":"@pesca_pet","twitter_misc":{"Written by":"Marko Herrmann","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#article","isPartOf":{"@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/"},"author":{"name":"Marko Herrmann","@id":"https:\/\/www.pesca.pet\/en\/#\/schema\/person\/a6c69adcd955e2976312c7db3979549a"},"headline":"Creation of the Tucuru\u00ed dam, Par\u00e1","datePublished":"1984-11-22T19:10:51+00:00","dateModified":"2020-06-10T01:41:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/"},"wordCount":194,"commentCount":0,"publisher":{"@id":"https:\/\/www.pesca.pet\/en\/#organization"},"image":{"@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pesca.pet\/wp-content\/uploads\/2020\/05\/Tucuru\u00ed.jpg","keywords":["Fishing Engineering","Linha do Tempo","Pesca no Brasil","PET Fishery"],"articleSection":["Estructura y organizaci\u00f3n","Fishing in Brazil"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/","url":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/","name":"Creation of the Tucuru\u00ed dam, Par\u00e1 &#8211; PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca","isPartOf":{"@id":"https:\/\/www.pesca.pet\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#primaryimage"},"image":{"@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pesca.pet\/wp-content\/uploads\/2020\/05\/Tucuru\u00ed.jpg","datePublished":"1984-11-22T19:10:51+00:00","dateModified":"2020-06-10T01:41:35+00:00","description":"The Tucuru\u00ed hydroelectric plant was designed according to the strategies established by the Federal Government's policy for the development of the North region, starting in the 1960s in search of the region's economic growth. Its objective was to serve the electric energy market polarized by Bel\u00e9m, and the high loads that would be installed as a result of the implementation of electro-intensive projects, based on the aluminum-alumina complex. The transmission line between Presidente Dutra (MA) and Boa Esperan\u00e7a (PI) promoted interconnection with the Northeast region.Work began on the construction of the Hydroelectric Plant and in 1970 the municipality of Tucuru\u00ed began to gain the necessary infrastructure. An airport and villages are built to house workers, engineers and other construction workers - (Vila Permanente and Temporary Villages I and II). Eletronorte's villas are closed condominiums with treated water and sewage, paved streets, lighting, supermarkets, schools, kindergartens, clubs, among other amenities. On November 22, 1984, the President of the Republic, from the military era, Jo\u00e3o Figueiredo, inaugurated the first generator of the first (1st) stage of the Tucuru\u00ed Hydroelectric Plant, with an installed capacity of 4,000 MW.","breadcrumb":{"@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#primaryimage","url":"https:\/\/www.pesca.pet\/wp-content\/uploads\/2020\/05\/Tucuru\u00ed.jpg","contentUrl":"https:\/\/www.pesca.pet\/wp-content\/uploads\/2020\/05\/Tucuru\u00ed.jpg","width":960,"height":580},{"@type":"BreadcrumbList","@id":"https:\/\/www.pesca.pet\/en\/criacao-da-represa-de-tucurui-para\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pesca.pet\/en\/"},{"@type":"ListItem","position":2,"name":"Creation of the Tucuru\u00ed dam, Par\u00e1"}]},{"@type":"WebSite","@id":"https:\/\/www.pesca.pet\/en\/#website","url":"https:\/\/www.pesca.pet\/en\/","name":"PET Pesca - Programa de Educaci\u00f3n Tutorial en Ingenier\u00eda de Pesca","description":"","publisher":{"@id":"https:\/\/www.pesca.pet\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pesca.pet\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pesca.pet\/en\/#organization","name":"PET Fishery - Fishery Engineering Tutorial Education Program","url":"https:\/\/www.pesca.pet\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pesca.pet\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.pesca.pet\/wp-content\/uploads\/2017\/05\/Logo72dpi300x300.png","contentUrl":"https:\/\/www.pesca.pet\/wp-content\/uploads\/2017\/05\/Logo72dpi300x300.png","width":300,"height":300,"caption":"PET Fishery - Fishery Engineering Tutorial Education Program"},"image":{"@id":"https:\/\/www.pesca.pet\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PETPescaUFRA\/","https:\/\/x.com\/pesca_pet","https:\/\/www.instagram.com\/pesca.pet\/","https:\/\/www.youtube.com\/channel\/UCGt6tGSMpezD9g2rlEvkR_w"]},{"@type":"Person","@id":"https:\/\/www.pesca.pet\/en\/#\/schema\/person\/a6c69adcd955e2976312c7db3979549a","name":"Marko Herrmann","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ce51fccf8c3e0c722d66f3f16b430346d5b7aecfb635219c6af1b13a77dcde9c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ce51fccf8c3e0c722d66f3f16b430346d5b7aecfb635219c6af1b13a77dcde9c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ce51fccf8c3e0c722d66f3f16b430346d5b7aecfb635219c6af1b13a77dcde9c?s=96&d=mm&r=g","caption":"Marko Herrmann"},"description":"Doctor in marine biology, university professor, tutor of the Fishery Engineering Tutorial Education Program - PET Pesca, actually researching and teaching at graduate and undergraduate courses at the Federal Rural University of Amazonia.","sameAs":["https:\/\/www.pesca.pet"],"url":"https:\/\/www.pesca.pet\/en\/author\/marko\/"}]}},"_links":{"self":[{"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/posts\/22648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/comments?post=22648"}],"version-history":[{"count":0,"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/posts\/22648\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/media\/21910"}],"wp:attachment":[{"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/media?parent=22648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/categories?post=22648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pesca.pet\/en\/wp-json\/wp\/v2\/tags?post=22648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}